Steeltech Homes


We are delighted to announce the latest structures in our product line – Steeltech Homes. This project has been in development over the last number of years in consultation with small builders all over the country.
There are 3 main steps in the process:
- Your builder installs a concrete base. (We will provide the necessary size and specifications.)
- Steeltech will then arrive on site to erect your brand new Steeltech Home in less than 3 days. (This is to include Composite Panel insulation, doors, windows, roof etc.)
- Your builder then returns to install the Internal fit-out. An average 3-bedroom Steeltech Home can be completed from Start to Finish in as little as 12 weeks – and at a fraction of the cost of a traditional build!
Steeltech will provide the main outer structure. Your Builder takes care of everything else – the Concrete Base and the Internal fit-out to include: wiring, plumbing, bathrooms, partition walls, flooring and kitchen.
Our sales team would be more than happy to help create a great-value building to fully suit your individual requirements.
- Do you need a cost effective alternative to a block built or timber frame house?
- Do you need a home to use as an Airbnb Rental?
- Do your children want their own private space?